Office hours: Mon–Thu 08:00–17:00 · Fri 08:00–13:00

After construction and refurbishment

Post-construction cleaning for an orderly handover

After construction, refurbishment or renovation, coordinated cleaning stages prepare areas for inspection, furnishing and use. DMA in Kelkheim plans the scope and timing for commercial premises in the Main-Taunus district around the progress of the works and the type of residue.

Request a post-construction cleaning quote
  • Rough and final cleaning
  • Coordinated with deadlines
  • Commercial projects

Purpose and benefits

From construction progress to a ready-for-use handover.

Depending on the project, interim cleaning, final builders' cleaning or several coordinated visits may be appropriate. We establish which trades have finished, which areas are accessible and what standard is required for handover.

Scope of service

Possible stages of post-construction cleaning

The relevant stages are selected according to the construction status and are not automatically treated as one package.

01

Rough builders' clean

During or after individual construction stages: remove loose debris and agreed non-hazardous waste to clear areas for subsequent work.

02

Interim cleaning

Between trades: remove new soiling from selected areas and prepare them for further work or inspections.

03

Final builders' clean

Once building work is complete: thoroughly remove construction dust and suitable residues from accessible floors, surfaces, fittings and sanitary fixtures.

04

Handover cleaning

Immediately before inspection or occupation: achieve the agreed final condition, including removal of dust accumulated since the previous clean. This may coincide with the final builders' clean.

Your individual quote

What determines the cost?

The area to be cleaned, construction stage, materials, residues and agreed cleaning phase form the basis of the quote. Accessibility, equipment requirements and coordination with other trades affect the time needed. Further work by other trades may require another cleaning visit; this is not automatically included in the initial clean.

How we prepare your quote

We clarify the construction stage, materials and planned handover. For larger areas or residues that are difficult to assess, a site visit helps determine suitable methods, equipment and access before quoting.

Planning and process

Define the construction status and responsibilities

Construction dust, loose debris and adhering residues require different steps. We plan the sequence around the state of the building and select suitable methods for approved surfaces. Sensitive materials and newly applied coatings are considered beforehand; unsuitable scrapers or aggressive products can cause damage.

Important for a realistic assessment

Hazardous materials, undeclared construction waste, trade repairs and rectification of material damage are not standard cleaning services and require separate clarification.

  1. Step 1

    Check progress

    The relevant work must be complete and the scheduled areas accessible.

  2. Step 2

    Identify residues

    Types of soiling, sensitive materials and possible specialist cases are assessed.

  3. Step 3

    Define the handover standard

    We record which areas should be delivered in which condition.

Questions and answers

Frequently asked questions about post-construction cleaning

These answers provide initial guidance. The agreed scope is always defined for the individual site.

01What is the difference between rough and final builders' cleaning?

A rough clean primarily removes loose heavy dirt. Final cleaning prepares completed areas for inspection, fitting out or use to the agreed standard.

02Do you dispose of construction waste?

Agreed, clearly identified non-hazardous loose materials may be included. Hazardous or undeclared waste and larger disposal tasks require separate arrangements.

03Can paint, adhesive or mortar residues be removed?

Only where the material, surface and suitable methods allow removal without damage. Persistent residues should be assessed before quotation.

04Can we inspect the completed work together?

Yes. For larger projects, a documented site walk-through helps identify the agreed areas, any visible outstanding work and existing construction-related damage.

Sample document

Sample service specification – post-construction cleaning

This sample outlines typical tasks, methods, quantities and cleaning frequencies. The binding scope is always tailored to the premises, usage and agreed schedule.

Example only. This document is not a binding quotation.
View PDF

Discuss your requirements

Let’s plan your post-construction cleaning

Your enquiry is without obligation.

WhatsAppDirect contact